top of page

NICTD Double Track Project #1

NICTD Double Track Project #1

Selected as Prime QC by Walsh/Herzog JV. The Northern Indiana Commuter Transportation District (NICTD) $650 million Double Track Project #1 includes construction of a new second railroad track and other improvements within a 26.6-mile section of NICTD’s existing South Shore Line (SSL) between Gary and Michigan City, Indiana. Some construction elements include a new separated two-track right-of-way in Michigan City, replacing the current street-running tracks, reconstruction of at-grade crossings, culvert replacements, passenger platform upgrades at five stations, and additional surface parking lots. Four (4) new railroad bridges will be constructed for the new second track. Three types of retaining wall systems will be constructed. Roadway reconstruction in Michigan City.

Client

Walsh/Herzog JV

Project Role

QC

nst-logo-white.png

GEOTECHNICAL ENGINEERING   
CONSTRUCTION MATERIALS TESTING
& INSPECTION

630-780-5201

23856 W. Andrew Road

Ste. 103

Plainfield, IL 60585

NST is an Equal Employment Opportunity employer.

Copyright © 2025 NASHnal Soil Testing.

All Rights Reserved. 

  • LinkedIn

© 2025 created by BELLA DIA DESIGNS LLC

bottom of page